
Silent CostSketch film: drawings upload, change-order flags, a Low, Likely, and High budget with RFIs, then the CostSketch logo.

Find the change ordersbefore they find you.
Know your costs. Catch your risks.
Measured takeoffs, drawing coordination, and pre-bid risk: RFIs and likely change orders flagged before you bid, reviewed by a real estimator.
Quick Budget 24 business hours · Small Job/Single Trade 72 business hours · Full Commercial quoted per job. After drawings and payment are received.
See what you get
Sample - fictional project, figures for illustration.
SAMPLE
Quick budget report
Construction Budget Estimate
Budget range: $108,000 – $161,000
- Low end to high end
- Flagged drawing items
- RFI list

Low end to high end
A range, not one number.
Flagged drawing problems
Conflicts and missing information called out before they become change orders.
RFI list
The questions to send back to the design team, pinned on the drawing with numbered red clouds.
Why the range goes up to $161,000
$108,000 + $53,000 = $161,000
- Kitchen hood, exhaust and makeup air added (RFI M-01)+$18k to +$32k
- Grease interceptor larger than assumed (RFI P-01)+$2k to +$9k
- Service upgrade for kitchen equipment (RFI E-01, E-02)+$3k to +$12k
- RFI findings
- M-01 Kitchen hood and makeup air not shown
- P-01 Grease interceptor size not scheduled
- E-01 Service size and panel schedule not provided
Sample - fictional project, figures for illustration.
Anonymized Case Study
Anonymized commercial TI review: 2,400 SF medical / optical retail fit-out. 120+ schedule cells cross-checked. 18 red RFI callouts pinned on the drawings before the bid.
BUILT FOR CONTRACTORS NATIONWIDE
Quick Budget turnaround
Measured, not guessed
Upload · Free preview · Pay 100% · Reviewed preview · Final files
A range, not one number.
Most contractors still run into errors, omissions, and rework. Processing one RFI has been estimated at about $1,080.
A 2024 Dodge Construction Network survey of U.S. and Canadian contractors found that 98% had projects with serious quality issues — errors, omissions, or rework — in the prior three years. Contractors who pointed to on-site coordination as a root cause reported an average 9% budget increase. A 2013 Navigant Construction Forum analysis estimated about $1,080 to process a typical RFI (about eight hours of administrative and technical review). That figure is not inflation-adjusted and is not a current universal U.S. cost. Finding conflicts in the drawings before bid day still reduces the chance those issues become RFIs or change orders.
Run my free drawing checkSources: Dodge Construction Network, Not By Design SmartMarket Brief (2024); Navigant Construction Forum, Impact & Control of RFIs on Construction Projects (2013).
From our customers
Real drawings. A real number.
A Woodbridge, VA contractor sent us their plumbing drawings. Here’s how our estimate compared to the real number.
Run my free drawing checkWe sent CostSketch our plumbing drawings and the estimate came back within 1% of the real number. Fast turnaround, clear breakdown, and it saved our team hours of takeoff time. We’ll be using them on our next public bids.
From drawings to numbers in six steps
- 1.Upload your drawings
- 2.See a free preview
- 3.Pay the fixed price
- 4.A person reviews your estimate
- 5.Delivery by email/download within the stated turnaround
- 6.Questions answered: ourteam@costsketch.com · (571) 390-4893
How We Build & Verify Your Estimate
A senior estimator verifies the drawing set, cross-checks schedules against the plans, measures trade quantities, prices regional labor and commercial supply-house materials, pins red RFI callouts on the drawings, and reviews every assumption before delivery.
1.Drawing & Scale Verification
Confirming the sheet register, revision dates, and calibrated scale bars on each sheet.
2.Schedule-to-Plan Cross-Check
Verifying equipment, fixture, panel, door, and finish schedules against floor plans and risers.
3.CSI Trade Quantity Takeoff
Measured counts, linear footage, and square footage, each with a sheet citation.
4.Local Wage & Commercial Supply-House Pricing
Regional trade labor rates and commercial supply-house material pricing, separated for underground and above-slab work, with low, likely, and high budget ranges.
5.On-Sheet Red RFI Callouts & Change-Order Risk Register
Numbered red clouds on the drawings themselves, plus a ready-to-send RFI list.
6.Senior Estimator QA Review
A senior estimator reviews every takeoff, callout, and assumption before delivery.
- Fixed, published prices
- Private, secure uploads
- 1550 Wilson Blvd, Ste 700 PMB760, Arlington, VA 22209
- (571) 390-4893
Read Your Drawings Before You Bid
A printable checklist for the gaps that become change orders. It does not review your drawings.
$100
- 20-point check by trade
- 10 change-order traps
- RFI template
- Scope-gap worksheet
- Bid-day go / no-go
$100 credited toward the $350 Quick Budget
Ready for a full number?
From sketch to cost.
CostSketch prepares measured takeoffs and preliminary budget estimates from your drawings for general contractors, trade subcontractors, developers and owners — verify before bidding.
Explore your deliverablesWhat is CostSketch?
CostSketch is a construction estimating service. It prepares preliminary budget estimates and measured trade takeoffs from PDF drawings for general contractors, trade subcontractors, developers, and investors with projects in the United States. Quick Budget is $350, Small Job Estimate is $950, Full Commercial Estimate is $2,500, $4,000, or $6,000, and Single Trade Package is $750, $1,100, or $1,500. A $100 drawing checklist is credited toward Quick Budget. Estimates are opinions of probable cost, not a guaranteed construction price. English and Spanish.