Construction terms, clearly defined.
Construction estimating uses specific terms to describe measured work, missing information and uncertainty. A takeoff records quantities from drawings; an RFI requests clarification; allowances cover known but incompletely defined items; contingency addresses broader uncertainty. These concise definitions help contractors and owners discuss bid scope without confusing a probable-cost estimate with a firm price.
Takeoff
Measured quantities of materials and work taken from drawings, organized by scope and drawing reference.
RFI
A request for information that asks the project team to clarify missing, conflicting or incomplete construction information.
Allowance
An identified amount for a known scope item whose selection, quantity or detail is not yet fully defined.
Contingency
A separate provision for uncertainty and potential costs that are not assigned to a specific defined scope item.
General conditions
Project-wide costs such as site supervision, temporary facilities, coordination and site administration.
Davis-Bacon
A federal prevailing-wage framework that can apply to covered federally funded or assisted construction contracts. Check the project's applicable determination.
Prevailing wage
A required wage and benefit standard for covered work, determined by the project location, funding, trade and applicable rules.
MEP
Mechanical, electrical and plumbing systems, often coordinated together because their routes and equipment share building space.
CSI division
A numbered construction specification category used to organize trade scope, materials and project requirements.
Confidence grade
An A/B/C indication of estimate uncertainty based on the completeness and clarity of the project's drawings and scope.